Kool Foam has been installing polyurethane foam trench breakers and insulation pillows for pipeline contractors since 2012. We’ve worked projects ranging from small rural lines to a 150-mile natural gas pipeline. We travel up to 400 miles for the right job — Oklahoma, Kansas, Texas, and beyond.
If you’ve got a project and need a quote fast, call us directly.
Trench breakers are installed at regular intervals along the pipeline trench to stop water from channeling through the backfill, prevent erosion, and allow the contractor to backfill in sections. Kool Foam sprays closed-cell polyurethane foam directly in the trench — wrapping the pipe, bonding to the sidewalls, and extending above the crown. It cures fast and locks the pipe in place before your backfill crew moves in.
For pipeline segments that need pipe support without full erosion control, we install foam insulation pillows — a foam bed sprayed under the pipe to cradle and protect it from the trench bottom. Fast to install, and eliminates hard-point contact that can damage pipe coatings over time.

No confined space entry. One or two-man crew works from above

Foam cures fast. You're not waiting on it.

Odd pipe sizes, irregular trench shapes, rocky or sandy terrain. Foam fills it.

Unlike sandbags, foam has no abrasive contact with the pipe surface

It doesn't shift, degrade, or wash out like filled bags.

We've done it in conditions where sandbags weren't an option
MILES
DAYS
in the field
keeping schedule
BARRELS/DAY
Got a project outside that range?
Call us. If the job is the right fit, we'll talk.
Tell us your trench specs — pipe size, trench depth and width, number of breakers, and location — and we’ll get back to you fast. We’re not a call center. When you call Kool Foam, you’re talking to someone who has been on a pipeline job site.
CALL OR TEXT
Hours: Monday–Friday, 7:30 AM – 5:00 PM